How to Make Model Boilers
A chapter devoted to the construction of model boilers may well open with a few cautionary words, as the dangers connected with steam-raisers are very real; and though model-boiler explosions are fortunately rare, if they do occur they may be extremely disastrous.Therefore the following warnings: -
(1.) Do not use tins or thin sheet iron for boilers. One cannot tell how far internal corrosion has gone. The scaling of 1/100 inch of metal off a "tin" is obviously vastly more serious than the same diminution in the thickness of, say, a 1/4-inch plate. Brass and copper are the metals to employ, as they do not deteriorate at all provided a proper water supply be maintained.
(2.) If in doubt, make the boiler much more solid than is needed, rather than run any risks. (3.) Fit a steam gauge, so that you may know what is happening.
(4.) Test your boiler under steam, and don't work it at more than half the pressure to which it has been tested.
In the present chapter we will assume that the barrels of all the boilers described are made out of solid-drawn seamless copper tubing, which can be bought in all diameters up to 6 inches, and of any one of several thicknesses. Brass tubing is more easily soldered, but not so good to braze, and generally not so strong as copper, other things being equal. Solid-drawn tubing is more expensive than welded tubing or an equivalent amount of sheet metal, but is considerably stronger than the best riveted tube.
Boiler ends may be purchased ready turned to size.
Get stampings rather than castings, as the first are more homogeneous, and therefore can be somewhat lighter.
Flanging Boiler Ends. - To make a good job, a plate for an end should be screwed to a circular block of hard wood (oak or boxwood), having an outside diameter less than the inside diameter of the boiler barrel by twice the thickness of the metal of the end, and a rounded-off edge. The plate must be annealed by being heated to a dull red and dipped in cold water. The process must be repeated should the hammering make the copper stubborn.
Stays should be used liberally, and be screwed and nutted at the ends. As the cutting of the screw thread reduces the effective diameter, the strength of a stay is only that of the section at the bottom of the threads.
Riveting. - Though stays will prevent the ends of the boiler blowing off, it is very advisable to rivet them through the flanges to the ends of the barrel, as this gives mutual support independently of soldering or brazing. Proper boiler rivets should be procured, and annealed before use. Make the rivet holes a good fit, and drill the two parts to be held together in one operation, to ensure the holes being in line. Rivets will not close properly if too long. Dies for closing the rivet heads may be bought for a few pence.
Soldering, etc. - Joints not exposed directly to the furnace flames may be soldered with a solder melting not below 350 degrees Fahr. Surfaces to be riveted together should be "tinned" before riveting, to ensure the solder getting a good hold afterwards. The solder should be sweated right through the joint with a blow-lamp to make a satisfactory job.
All joints exposed to the flames should be silver-soldered, and other joints as well if the working pressure is to exceed 50 lbs. to the square inch. Silver-soldering requires the use of a powerful blow-lamp or gas-jet; ordinary soft soldering bits and temperatures are ineffective. Brazing is better still, but should be done by an expert, who may be relied on not to burn the metal. It is somewhat risky to braze brass, which melts at a temperature not far above that required to fuse the spelter (brass solder). Getting the prepared parts of a boiler silver-soldered or brazed together is inexpensive, and is worth the money asked.
FIG. 78.Some Points in Design.
The efficiency of a boiler is governed chiefly (1) by the amount of heating surface exposed to the flames; (2) by the distribution of the heating surface; (3) by the amount of fuel which can be burnt in the furnace in a given time; (4) by avoiding wastage of heat.
The simplest form of boiler, depicted in Fig. 78, is extremely inefficient because of its small heating surface. A great deal of the heat escapes round the sides and the ends of the boiler. Moreover, a good deal of the heat which passes into the water is radiated out again, as the boiler is exposed directly to the air.
Fig. 79 shows a great improvement in design. The boiler is entirely enclosed, except at one end, so that the hot gases get right round the barrel, and the effective heating surface has been more than doubled by fitting a number of water-tubes, aaa, bbbb, which lie right in the flames, and absorb much heat which would otherwise escape. The tubes slope upwards from the chimney end, where the heat is less, to the fire-door end, where the heat is fiercer, and a good circulation is thus assured. The Babcock and Wilcox boiler is the highest development of this system, which has proved very successful, and may be recommended for model boilers of all sizes.
The heating surface may be increased indefinitely by multiplying the number of tubes. If a solid fuel-coal, coke, charcoal, etc.-fire is used,

FIG. 79 - Side and end elevations of a small water-tube boiler.
the walls of the casing should be lined with asbestos or fire-clay to prevent the metal being burnt away.
The horizontal boiler has an advantage over the vertical in that, for an equal diameter of barrel, it affords a larger water surface, and is, therefore, less subject to "priming," which means the passing off of minute globules of water with the steam. This trouble, very likely to occur if the boiler has to run an engine too large for it, means a great loss of efficiency, but it may be partly cured by making the steam pass through coils exposed to the furnace gases on its way to the engine. This "superheating" evaporates the globules and dries the steam, besides raising its temperature. The small water-tube is preferable to the small fire-tube connecting furnace and chimney, as its surface is exposed more directly to the flames; also it increases, instead of decreasing, the total volume of water in the boiler.
A Vertical Boiler.
The vertical boiler illustrated by Fig. 80 is easily made. The absence of a water jacket to the furnace is partly compensated by fitting six water-tubes in the bottom. As shown, the barrel is 8 inches long and 6 inches in outside diameter, and the central flue 1-1/2 inches across outside solid-drawn 1/16-inch

FIG. 80. -- Details of vertical boiler.
tubing, flanged ends, and four 1/4-inch stays - disposed as indicated in Fig. 80 (a) and (b) - are used. The 5/16 or 3/8 inch water-tubes must be annealed and filled with lead or resin before being bent round wooden templates. After bending, run the resin or lead out by heating. The outflow end of each pipe should project half an inch or so further through the boiler bottom than the inflow end.
Mark out and drill the tube holes in the bottom, and then the flue hole, for which a series of small holes must be made close together inside the circumference and united with a fret saw. Work the hole out carefully till the flue, which should be slightly tapered at the end, can be driven through an eighth of an inch or so. The flue hole in the top should be made a good fit, full size.
Rivet a collar, x (Fig. 80, a), of strip brass 1/4 inch above the bottom of the flue to form a shoulder. Another collar, y (Fig. 80, c), is needed for the flue above the top plate. Put the ends and flue temporarily in place, mark off the position of y, and drill half a dozen 5/32-inch screw holes through y and the flue. Also drill screw holes to hold the collar to the boiler top.
The steam-pipe is a circle of 5/16-inch copper tube, having one end closed, and a number of small holes bored in the upper side to collect the steam from many points at once. The other end is carried through the side of the boiler.
Assembling. - The order of assembling is: - Rivet in the bottom;

FIG. 81. - Perspective view of horizontal boiler mounted on wooden base.
put the steam-pipe in place; rivet in the top; insert the flue, and screw collar y to the top; expand the bottom of the flue by hammering so that it cannot be withdrawn; insert the stays and screw them up tight; silver-solder both ends of the flue, the bottom ends of the stays, and the joint between bottom and barrel. The water-tubes are then inserted and silver-soldered, and one finishes by soft-soldering the boiler top to the barrel and fixing in the seatings for the water and steam gauges, safety-valve, mud-hole, filler, and pump-if the last is fitted.
The furnace is lined with a strip of stout sheet iron, 7 inches wide and 19-1/4 inches long, bent round the barrel, which it overlaps for an inch and a half. Several screws hold lining and barrel together.
To promote efficiency, the furnace and boiler is jacketed with asbestos -- or fire-clay round the furnace -- secured by a thin outer cover. The enclosing is a somewhat troublesome business, but results in much better steaming power, especially in cold weather.
Air-holes must be cut round the bottom of the lining to give good ventilation.
A boiler of this size will keep a 1 by 1-1/2 inch cylinder well supplied with steam at from 30 to 40 lbs. per square inch.
A Horizontal Boiler.
The boiler illustrated by Fig. 81 is designed for heating with a large paraffin or petrol blow-lamp.

FIG. 82. - Longitudinal section of large water-tube boiler
It has considerably greater water capacity, heating surface --the furnace being entirely enclosed -- and water surface than the boiler just described. The last at high-water level is about 60, and at lowwater level 70, square inches.
The vertical section (Fig. 82) shows 1/16-inch barrel, 13 inches long over all and 12 inches long between the end plates, and 6 inches in diameter. The furnace flue is 2-1/2 inches across outside, and contains eleven 1/2-inch cross tubes, set as indicated by the end view (Fig. 83), and 3/4 inch apart, centre to centre. This arrangement gives a total heating surface of about 140 square inches. If somewhat smaller tubes are used and doubled (see Fig. 84), or even trebled, the heating surface may be increased to 180- 200 square inches. With a powerful blow-lamp this boiler raises a lot of steam.
Model Boilers - Part 2 >>>>
steam boiler (Category: Toys & Hobbies )
Boiler Front and Light for Tyco 2-8-0 Steam Locomotive
Wed, 04 Nov 2009 04:25:37 PST
| US $1.49 (0 Bid) End Date: Monday Nov-09-2009 4:25:37 PST Bid now | Add to watch list |
80 TON STEAM BOILER EQUIPT BY CHOOCH TOP FREIGHT ITEM
Sat, 07 Nov 2009 10:00:12 PST
| US $17.99 End Date: Saturday Nov-14-2009 10:00:12 PST Buy It Now for only: US $17.99 Buy it now | Add to watch list |
Lionel Large Scale part: Steam Loco Boiler Front - NEW!
Sun, 01 Nov 2009 18:01:18 PST
| US $3.99 (0 Bid) End Date: Sunday Nov-08-2009 18:01:18 PST Bid now | Add to watch list |
Wilesco D455 Spare Boiler for Model Toy Steam Engine
Thu, 28 May 2009 12:43:39 PDT
| US $69.99 End Date: Tuesday Nov-24-2009 11:48:39 PST Buy It Now for only: US $69.99 Buy it now | Add to watch list |
PUTPUT STEAM BOAT WITH BOILER
Sun, 01 Nov 2009 22:14:08 PST
| US $13.72 End Date: Wednesday Nov-11-2009 22:14:08 PST Buy It Now for only: US $13.72 Buy it now | Add to watch list |
STUART S-50 MILL ENGINE AND STEAM BOILER PLANT
Tue, 03 Nov 2009 10:19:45 PST
| US $850.00 End Date: Thursday Dec-03-2009 10:19:45 PST Buy It Now for only: US $850.00 Buy it now | Add to watch list |
ORIGINAL AMERICAN FLYER STEAM LOCO BOILER FRONT
Wed, 04 Nov 2009 18:17:02 PST
| US $6.99 (0 Bid) End Date: Wednesday Nov-11-2009 18:17:02 PST Bid now | Add to watch list |
BOILER ready to fire, for Stuart Live Steam Engine
Mon, 26 Oct 2009 15:48:50 PDT
| US $315.00 End Date: Wednesday Nov-25-2009 14:53:50 PST Buy It Now for only: US $315.00 Buy it now | Add to watch list |
Tyco HO Scale 0-8-0 Steam Locomotive Boiler Fronts
Wed, 04 Nov 2009 15:07:14 PST
| US $1.99 (0 Bid) End Date: Monday Nov-09-2009 15:07:14 PST Bid now | Add to watch list |
HO Wood Planked Work Car Kit with Steam Boiler & Donkey
Fri, 06 Nov 2009 14:15:17 PST
| US $45.89 (0 Bid) End Date: Friday Nov-13-2009 14:15:17 PST Bid now | Add to watch list |
Large Boiler Kit for Stuart Steam Engine or Other
Sat, 16 May 2009 13:29:03 PDT
| US $203.95 End Date: Thursday Nov-12-2009 12:34:03 PST Buy It Now for only: US $203.95 Buy it now | Add to watch list |
ACCUCRAFT C-19 LIVE STEAM #AL-87-134 GREEN BOILER
Tue, 03 Nov 2009 16:38:48 PST
| US $1,500.00 (1 Bid) End Date: Sunday Nov-08-2009 16:38:48 PST Bid now | Add to watch list |
Lionel #671-11 Steam Loco part: BOILER FRONT NOS, EXC!
Mon, 02 Nov 2009 18:01:08 PST
| US $6.99 (1 Bid) End Date: Monday Nov-09-2009 18:01:08 PST Bid now | Add to watch list |
1920's Kingsbury Steam Boiler Fire Engine (fire1b)
Sun, 01 Nov 2009 11:47:52 PST
| US $975.00 End Date: Tuesday Dec-01-2009 11:47:52 PST Buy It Now for only: US $975.00 Buy it now | Add to watch list |
VINTAGE WEEDEN ERA STEAM ENGINE METAL MODEL BOILER #3
Thu, 05 Nov 2009 07:31:56 PST
| US $19.99 (1 Bid) End Date: Tuesday Nov-10-2009 7:31:56 PST Bid now | Add to watch list |
Vertical Boiler KIT for Stuart Steam Engines or others
Wed, 24 Jun 2009 10:18:28 PDT
| US $143.99 End Date: Saturday Nov-21-2009 9:23:28 PST Buy It Now for only: US $143.99 Buy it now | Add to watch list |
HO PLASTIC & BRASS STEAM ENGINE BOILER SHELL PART
Sat, 31 Oct 2009 10:53:40 PDT
| US $1.99 End Date: Tuesday Nov-10-2009 9:53:40 PST Buy It Now for only: US $1.99 Buy it now | Add to watch list |
RARE HO STEAM HOIST & BOILER 1031 DOUBLE DRUM HOIST
Tue, 03 Nov 2009 12:27:40 PST
| US $34.99 (0 Bid) End Date: Tuesday Nov-10-2009 12:27:40 PST Bid now | Add to watch list |
Live Steam Plant - Westbury Engine w/Boiler
Wed, 28 Oct 2009 18:42:11 PDT
| US $320.00 End Date: Friday Nov-27-2009 17:42:11 PST Buy It Now for only: US $320.00 Buy it now | Add to watch list |
LIONEL TRAIN 675 2025 2035 STEAM LOCO BOILER FRONT, NEW
Sat, 10 Oct 2009 19:02:05 PDT
| US $22.99 End Date: Monday Nov-09-2009 18:02:05 PST Buy It Now for only: US $22.99 Buy it now | Add to watch list |
VINTAGE WEEDEN ERA STEAM ENGINE METAL MODEL BOILER #2
Thu, 05 Nov 2009 07:20:19 PST
| US $19.99 (1 Bid) End Date: Tuesday Nov-10-2009 7:20:19 PST Bid now | Add to watch list |
HO STEAM ENGINE BOILER MANTUA/TYCO 2-8-2 2-8-4
Sun, 30 Aug 2009 18:03:24 PDT
| US $12.95 End Date: Saturday Nov-28-2009 17:08:24 PST Buy It Now for only: US $12.95 Buy it now | Add to watch list |
NEW! Accucraft's Live Steam 0-4-4 Green Boiler Forney
Thu, 29 Oct 2009 18:01:17 PDT
| US $649.99 End Date: Saturday Nov-28-2009 17:01:17 PST Buy It Now for only: US $649.99 Buy it now | Add to watch list |
Old Gauge 1 Live Steam Locomotive Boiler, Germany, 1910
Sat, 07 Nov 2009 04:32:36 PST
| US $25.00 (0 Bid) End Date: Saturday Nov-14-2009 4:32:36 PST Buy It Now for only: US $75.00 Bid now | Buy it now | Add to watch list |
Vertical Steam Boiler Kit - Metal & Resin Kit
Fri, 06 Nov 2009 14:02:51 PST
| US $9.17 (0 Bid) End Date: Friday Nov-13-2009 14:02:51 PST Bid now | Add to watch list |